Service
A 1960s 100-amp panel was built for a house with one TV and no air conditioning. Add central air, an induction range, a dryer, and an EV — and you're tripping breakers or, worse, running everything at the edge. We upgrade panels and service to 200A, handle ConEd coordination and permits, and leave you with a panel labeled so well you'll never guess again.
Call us when
Pricing, honestly
Panel upgrades are quoted in writing after the load calculation — one number including the panel, labor, permits, and inspection. Federal Pacific and Zinsco replacements are priorities; those panels have documented failure-to-trip rates.
How we handle it
We calculate your actual demand — current and planned. Sometimes you don't need the upgrade, and we'll tell you that too.
NYC electrical permits, inspection scheduling, and utility coordination are all on us. You don't make a single phone call.
Most upgrades complete in a day. Every breaker labeled accurately, every circuit tested, paperwork filed.
Common questions
Open the door and read the brand. Federal Pacific (Stab-Lok) and Zinsco panels have documented histories of breakers failing to trip during faults. If you have one, get it evaluated — that's not upsell, that's the fire data.
Often, but not always — a load calculation tells us. Sometimes a load-management device lets your existing service handle it for far less money. We check before quoting the big job.
Open 7 days until 9 PM — we typically reply in 15 minutes.
Typically replies in 15 minutes.